60% Lead Time Reduction on Flight-Critical Brackets
Challenge: Client needed 1,200 titanium mounting brackets with AS9100-level traceability delivered in 3 weeks — their incumbent supplier quoted 8 weeks minimum.
Solution: Fabrix AI matched the job to two pre-audited 5-axis CNC shops in our network, ran parallel DFM analysis to optimize tool paths, and coordinated split-lot production with real-time QC dashboards.
Lead Time
3 weeks (vs. 8 quoted)
Cost Saving
34%
Tolerance
±0.02 mm achieved
On-Time
100%