
Dimensional inspection
Standard checks for every order, with full dimensional or CMM reporting available for drawing-critical parts.
Quality system
From prototype checks to production documentation, the quality path is defined at RFQ: dimensions, material certs, CoC, FAI, packing photos and traceability records when the program needs them.

Standard checks for every order, with full dimensional or CMM reporting available for drawing-critical parts.

Mill certs and material traceability can be requested at quote stage for medical, aerospace, energy and semiconductor programs.

First Article Inspection, Certificate of Conformance and inspection photos are handled as deliverables, not afterthoughts.

Revision control, secure file handling and supplier handoff rules reduce leakage, mismatch and undocumented changes.
Deliverables
Each document should be requested in the RFQ so cost, lead time and inspection route are defined before production.
| Document | When to use | Output |
|---|---|---|
| Standard inspection | Prototype and normal production parts | Pass/fail checks and critical dimensions |
| Full dimensional report | Drawing-controlled parts | Measured values against print requirements |
| Material certificate | Traceability-sensitive programs | Material grade, heat or lot documentation |
| CoC / FAI | Aerospace, medical, automotive or production release | Certificate of Conformance or first-article record |
| Packing photos | Cosmetic, export or high-value shipments | Visual record before dispatch |
Controlled flow
The goal is not to inspect too late; it is to define requirements early and keep the order package coherent.
DOC-01
Tolerance, material, finish and documentation requirements are captured before production starts.
DOC-02
Critical features, GD&T, surface callouts and inspection method are reviewed with the quote.
DOC-03
Material, revision and operation records stay tied to the job for repeat orders.
DOC-04
Inspection files, certificates and packing records are delivered with the shipment when requested.
Add the quality package to your quote request before production starts.